BPMN Modeler – Release Notes – July 31, 2017
Blog: Trisotech
New and Improved Features: The way we create references from a BPMN Model to another was aligned with the way we reference CMMN and DMN models. You will now have the BPMN logo in the Reuse section of the BPMN ribbon. Previously, this functionality was under the Sub-Process drop-down in the same ribbon. Collapsing an […]
The post BPMN Modeler – Release Notes – July 31, 2017 appeared first on Trisotech.
Leave a Comment
You must be logged in to post a comment.